2012

The drill cuttings site is 167x129m in size. During the construction of the “drill cuttings site”, 8302 m3 of concrete was poured;
Drainage channel around the perimeter of concrete paving;
Channels for laying lines for technological needs and laying cables;
Installation of a reinforced concrete slab measuring 51x70x0.3m, for the subsequent placement of equipment for processing, disposal of sludge and related structures necessary during operation;
Concrete paving with a thickness of 250 mm for the passage of equipment around the sludge tanks