2016 – 2020

Since 2016, Ariadna has been annually performing cycles of work on the arrangement of production and prospective wells of the Tengiz field. The works include trenching for flow lines from wells to group metering units, welding of pipelines, manufacture and installation of pipe assemblies and shut-off valves, laying of auxiliary pipelines and cable ducts, external piping and installation of downhole equipment