2014

The first piles for the foundation of the Third Generation Plant were entrusted to the specialists of Ariadna LLP. In May 2014, 30 piles with a length of 16 m were loaded at the site of the future plant. For the Sour Gas Reinjection Plant, 20 test piles were driven. Comprehensive tests of piles under a dynamic load of up to 300 tons were carried out at several sites