Specialized site No. 1 (Foundation and foundations)

Transportation of piles up to 16 meters in size

Repair and restoration works

Cutting pile heads

                             Pile crumbling                               (exposure of reinforcing bars)

Immersion, dismantling of sheet piles

Device, testing of bored reinforced concrete piles (up to 300 tons)

Immersion, dismantling of sheet piles

Puncturing under road, railway and road surfaces

Driving of prefabricated reinforced concrete piles (up to 400 * 400 * 16000 m)

Pile static load testing (up to 300 tons)