FOUNDATION WORKS

During the foundation work of Warehouse 21, 22, 1034.82 m3 of concrete was poured.
The installation of anchor bolts, sleeves, anchor plates and other embedded parts was also carried out. Ariadna LLP carried out the scope of work on the production of concrete works (installation of pile grillages and foundation beams) and installation of utilities under the foundation beams of the warehouse building. Underground laying of utilities includes: pipelines for fire water, drinking water supply and sewerage systems, as well as cable wires for electrical cables and instrumentation. At the end, backfilling and compaction of the soil